English
Fluctuating revenue and flood protection discussed at Juneau work session
A total of $2 million each would be given to the two preferred projects, with $1 million given to the third most preferred project. The majority of the budget would go towards operations and solution work.
During the retreat, the Assembly discussed increasing the budget for flood protection by over $600,000.