English

Caltrans installs flood protection system at Bay Bridge toll plaza

Caltrans installs flood

The bright orange flood barrier extends a half-mile stretch on the far-right shoulder of westbound Interstate 80 near the metering lights. After the flood barrier was installed, the far-right lane HOV lane was reopened to traffic at 8 a.m.

The system is a series of connected orange tubes made of durable material that are filled with water and anchored down, said Caltrans spokesperson Pedro Quintana.

Related Articles

زر الذهاب إلى الأعلى