English
The 30 Finished Boeing 777-9s Parked In Washington That No Airline Wants To Fly

This means that the gap between the earliest completed airframes and the final production configuration has become particularly significant. That distinction explains why the headline about airlines refusing to fly the aircraft can be misleading.
An airline taking one would effectively be accepting an aircraft that needs additional work before it becomes equivalent to a later production aircraft.